Monday, June 27, 2022

Bulletin Article: June 26

I have signed a contract with Jones Lawn Care to repair the labyrinth which is located outside of the church. He will level all bricks and repair areas that are damaged.


I am hopeful that prior to the start of the school year a security door will be installed inside of the school. This door will provide an extra of security which will keep people from having instant access to the school building without first being buzzed in. 


We have finally received approval with the diocese to move forward with an architect, Uwe Rothe, to devise a master plan for our campus. This will be helpful in defining what can be achieved in the lower level as well as other needs that we have for our campus. There is a major need to make sure that we can have proper space for parish social gatherings.


We are currently working with Michael Stone, architect, to design bathrooms and kitchen for the lower level. This will hopefully go out to bid for construction in the near future. Despite whatever the long term plan for the lower level may be these bathrooms will be a necessary improvement.


The master plan and bathroom/kitchen project are being funded by the HOME Campaign. All remaining money from the HOME Campaign will be used in the lower level to carry out projects designated from the master plan.


In Christ,

Fr. Dustin Collins

No comments: